The following is a list of unit standards currently available for scaffolding, rigging and industrial rope access
| Unit No |
Unit Title |
Level |
Credit |
| 4200 |
Plan and prepare basic scaffolding work |
3 |
27 |
| 4201 |
Erect, alter and repair basic scaffolding and/or equipment |
3 |
30 |
| 4202 |
Inspect basic scaffold and/or equipment ready for use |
3 |
10 |
| 4203 |
Dismantle basic scaffolding and/or equipment and prepare for removal |
3 |
12 |
| 4204 |
Plan and prepare suspended scaffolding work |
4 |
27 |
| 4205 |
Erect, alter and repair suspended scaffolding work |
4 |
30 |
| 4206 |
Inspect suspended scaffold and/or equipment ready for use |
4 |
10 |
| 4207 |
Dismantle suspended scaffolding and/or equipment and prepare for removal |
4 |
12 |
| 4208 |
Plan and prepare advanced scaffolding work |
4 |
52 |
| 4209 |
Erect, alter and repair advanced scaffolding and/or equipment |
4 |
50 |
| 4210 |
Inspect advanced scaffold and/or equipment ready for use |
4 |
10 |
| 4211 |
Dismantle advanced scaffolding and/or equipment and prepare for removal |
4 |
20 |
| 4212 |
Plan and prepare basic rigging work |
2 |
25 |
| 4213 |
Complete basic rigging work |
2 |
35 |
| 4214 |
Plan and prepare intermediate rigging work |
3 |
35 |
| 4215 |
Complete intermediate rigging work |
3 |
45 |
| 4216 |
Dismantle structures and/or plant at intermediate rigging level |
3 |
15 |
| 4217 |
Plan and prepare advanced rigging work |
4 |
40 |
| 4218 |
Complete advanced rigging work |
4 |
55 |
| 4219 |
Dismantle structures and/or plant at advanced rigging level |
4 |
25 |
| 19358 |
Describe legislative requirements for industrial rope access industry |
3 |
3 |
| 19359 |
Inspect and maintain industrial rope access equipment |
3 |
3 |
| 19360 |
Plan and prepare for industrial rope access work |
3 |
3 |
| 19361 |
Set up and dismantle basic industrial rope access systems |
3 |
14 |
| 19362 |
Carry out elementary on-rope skills |
3 |
14 |
| 19363 |
Carry out simple recovery techniques |
3 |
15 |
| 19364 |
Identify and apply industrial rope access legislation |
4 |
8 |
| 19365 |
Select and safely use industrial rope access equipment |
4 |
15 |
| 19366 |
Plan and prepare for advanced industrial rope access work |
4 |
20 |
| 19367 |
Set up, alter and dismantle basic industrial rope access systems |
4 |
25 |
| 19368 |
Carry out advanced industrial rope access techniques |
4 |
25 |
| 19369 |
Carry out advanced retrieval techniques |
4 |
25 |
| 19620 |
Interpret and apply scaffolding health and safety legislative requirements |
3 |
3 |
| 19621 |
Interpret and apply legislative requirements in the design of scaffolding works |
3 |
3 |
| 19622 |
Use and maintain scaffolding hand and power tools |
3 |
4 |
| 19623 |
Use tube and coupler in standing propriety scaffolds |
3 |
8 |
| 20259 |
Interpret and apply the Health and Safety in Employment Act rigging industry activities |
3 |
3 |
| 20260 |
Demonstrate knowledge of the Approved Code of Practice for Load Lifting Rigging |
2 |
3 |
| 20261 |
Use and maintain rigging hand tools |
3 |
4 |
| 20262 |
Use and maintain rigging portable power and portable compressed air tools |
3 |
4 |
| 20263 |
Use and maintain rigging plant and equipment |
3 |
4 |
| 20855 |
Handle and maintain basic scaffolding components |
2 |
5 |
| 20856 |
Plan and prepare for the erection of scaffolding |
3 |
5 |
| 20857 |
Prepare a scaffolding site for the basing out of scaffolding |
3 |
5 |
| 20858 |
Base out tube and fitting scaffolding |
3 |
12 |
| 20859 |
Base out proprietary scaffolding |
3 |
4 |
| 20860 |
Base out individual component proprietary scaffolding |
3 |
6 |
| 20861 |
Demonstrate at height safety procedures for the erection of scaffolding |
3 |
6 |
| 20862 |
Demonstrate at height safety procedures for the dismantling of scaffolding |
3 |
6 |